The migration isn't finished at cutover.
A cloud migration doesn't end when the last workload cuts over. It ends when the on-prem hardware is decommissioned, the data is destroyed with evidence, the residual value is recovered to the balance sheet, and the physical footprint is handed back to the landlord. The gap between cutover and that final state is where cloud migrations overrun their budgets — on-prem gear that's already paid for keeps costing: power, space, support contracts, insurance, security. A one-off disposal vendor can clear a room. A program sequences the clearance against your migration portfolio so the on-prem cost trail actually ends.
Maxicom USA runs cloud-migration ITAD as a multi-site program. We join your migration project at the planning stage, align cohort schedules against your cutover roadmap, decommission each site on the right side of its migration window, destroy data to NIST 800-88 under our chain of custody, and remarket the current-gen gear so residual value flows back to CapEx instead of being written off. One program, one US-side invoice, one audit trail against every cutover.
This fits enterprises finishing 18-36 month migrations to AWS, Azure, or GCP. It fits multi-cloud programs with mixed cutover dates. It fits the cloud repatriation case too — workloads coming back on-prem, new gear landing, old gear retiring — where the ITAD workflow is the mirror image but the program shape is identical.
What cloud-migration ITAD includes.

Why it belongs to a program, not a ticket.
A cloud migration is a portfolio of cutover events across 18-36 months. A single site might have three cutover waves: the first dependencies move, then the dependent workloads, then the final fallback systems. The on-prem gear retires in waves too. A one-off disposal vendor engaged after each wave is three separate RFPs, three scope negotiations, three CoC trails, three invoices. By the second site you're running a procurement project instead of finishing your migration.
A program contract replaces all of that with a single MSA and a cohort schedule. Each cohort is a pickup window pegged to a cutover date. The scope definition happens once, during migration planning, not three times per site. The CoC trail is continuous across the portfolio. The reporting rolls up: how much was destroyed, how much was remarketed, what the residual value recovery looks like against the migration budget, what the Scope 3 reuse data was.
For a mid-sized enterprise doing 5 sites over 24 months, program ITAD typically saves 200-400 hours of program management time and 15-30% of the per-drive disposition cost against piecemeal RFPs. For a Fortune 500 at 50+ sites, the numbers are an order of magnitude larger.
Migration phase × on-prem footprint × Maxicom role.
| Migration phase | Typical on-prem footprint | Maxicom role | Timing |
|---|---|---|---|
| Discovery & planning | Full on-prem, no migration yet | Program scope, cohort plan, site survey | T – 6 to T – 12 months |
| Wave 1 (dependency migration) | Partial retirement of edge systems | Small-cohort pickups, data destruction, continued-use gear flagged | T + 0 to T + 3 months per site |
| Wave 2 (workload migration) | Majority of workloads cut over, fallback gear still active | Major cohort pickup, remarket current-gen, destroy sensitive media | T + 3 to T + 9 months per site |
| Wave 3 (fallback retirement) | Fallback systems retired, DC floor emptying | Final DC floor clearance, PDU/UPS/HVAC coordination, site handback | T + 9 to T + 18 months per site |
| Program close | Zero on-prem | Consolidated reporting, licence cancellation evidence, ESG dataset | T + 18 to T + 24 months portfolio-wide |
Cloud repatriation also counts.
Some workloads are coming back on-prem. The 2024-2026 repatriation trend is real — 37signals / Basecamp, Dropbox, GEICO, Ahrefs, X all published migrations away from cloud for workloads where on-prem math wins at scale. For those enterprises, the ITAD workflow runs in reverse: new on-prem gear lands, cloud workloads cut back over, and then the cloud resources get de-provisioned. But the new on-prem rollout usually displaces older on-prem gear that was running fallback or edge workloads during the cloud era. That older gear needs the same cohort-planned ITAD treatment as a cloud-outbound migration — data destruction, residual value recovery, licence cancellation.
Maxicom's program model covers both directions. If you're running a repatriation and need the old on-prem swap-out handled alongside the new deployment, same contract, same CoC standard, same reporting. The direction of the workload flow doesn't change the ITAD mechanics.
The program flow.
Migration roadmap review
We review your cutover calendar, dependency map, and site-by-site rollout plan. Cohort pickup windows mapped against each cutover event. SOW drafted.
Cohort planning per site
Per-site asset inventory, sensitivity classification, resale-vs-destroy triage, on-site vs off-site destruction decision per cohort. Scheduled against your cutover dates.
Cutover-aligned pickups
Pickup executed in the window your migration manager specified. No earlier (you still need fallback), no later (on-prem costs keep accruing).
Destruction + remarket
Data destruction to NIST 800-88 with cert per drive. Current-gen gear remarketed, residual value settled in USD. Prior-gen value-recovered; end-of-life routed to media destruction.
ESG + finance report
Quarterly report to the migration PMO: cost against budget, residual value recovered, drives destroyed, Scope 3 reuse data, OEM support cancellation evidence. Rolls up to program close.
Where the value comes back.
For the cloud program director.
Close your migration without an on-prem overhang.
Your migration budget is measured at close. The on-prem overhang after cutover is what makes migrations overrun. One ITAD program against your migration roadmap closes the on-prem cost trail on schedule, recovers residual value back to your budget, and gives your CFO a cleaner number at the close.
Residual value flows back to CapEx, not written off.
Fully-depreciated gear can still carry meaningful residual value. A program-level approach captures it instead of writing it off. We settle in USD to the parent entity, invoice in USD, reconcile to your AP.
FAQ.
How do you align with our cutover dates?
Your migration PMO owns the cutover calendar. We align cohort pickups to specific windows per site — typically T + 30 to T + 60 days after each cutover wave, scheduled when the fallback gear is confirmed retired. If a cutover slips, the cohort pickup slips with it; our program contract handles schedule flex at the cohort level.
What about gear still in active fallback?
Fallback gear stays in place until your migration team releases it. Our program contract includes a "parked cohort" model — we scope and plan but don't execute until the fallback release is formalised. No on-prem costs accrue to Maxicom during parking; you only pay when execution happens.
Multi-cloud migrations?
Same program model regardless of the hyperscaler mix. If you're splitting workloads between AWS, Azure, and GCP, the on-prem retirement cohorts align to the workload cutover schedule, not the destination. Portfolio-wide reporting rolls up across all cohorts.
Cloud repatriation workflow?
Mirror image. New on-prem gear arrives, old fallback/edge gear cohorts retire, data destruction + residual recovery runs on the same program contract. We handle both directions under one SOW.
Which hyperscalers have you worked alongside?
Our customers run migrations into AWS, Azure, GCP, and OCI, plus private cloud deployments on VMware Cloud, Nutanix, and OpenStack. We don't have a hyperscaler partnership — we're brand-agnostic on the cloud side too. Our role is on the on-prem retirement, not the cloud deployment.