Sales:SALES@maxicom.us
Cloud migration — last mile

Cloud migration ITAD. The last mile of your move.

A cloud migration is only finished when the on-prem hardware stops costing money and starts returning value. Maxicom USA runs the last mile — decommissioning on-prem data centers, destroying data, and recovering residual value — across every site in one program.

Multi-site, one programCutover-alignedResidual value → CapEx
On-prem data center decommissioning as part of a cloud migration

The migration isn't finished at cutover.

A cloud migration doesn't end when the last workload cuts over. It ends when the on-prem hardware is decommissioned, the data is destroyed with evidence, the residual value is recovered to the balance sheet, and the physical footprint is handed back to the landlord. The gap between cutover and that final state is where cloud migrations overrun their budgets — on-prem gear that's already paid for keeps costing: power, space, support contracts, insurance, security. A one-off disposal vendor can clear a room. A program sequences the clearance against your migration portfolio so the on-prem cost trail actually ends.

Maxicom USA runs cloud-migration ITAD as a multi-site program. We join your migration project at the planning stage, align cohort schedules against your cutover roadmap, decommission each site on the right side of its migration window, destroy data to NIST 800-88 under our chain of custody, and remarket the current-gen gear so residual value flows back to CapEx instead of being written off. One program, one US-side invoice, one audit trail against every cutover.

This fits enterprises finishing 18-36 month migrations to AWS, Azure, or GCP. It fits multi-cloud programs with mixed cutover dates. It fits the cloud repatriation case too — workloads coming back on-prem, new gear landing, old gear retiring — where the ITAD workflow is the mirror image but the program shape is identical.

What cloud-migration ITAD includes.

DC floor decommissioningDe-racking, cable harvest, PDU shutdown, HVAC coordination, security badge return. Site handed back to the landlord in the state your lease requires.
Server + storage + networking retirementCohort-planned pickup aligned with cutover dates. Current-gen gear triaged for remarket; prior-gen for value recovery; end-of-life for destruction.
Data destruction — NIST 800-88Every drive sanitised or destroyed to NIST 800-88. Certificate per drive. Witnessed on-site where compliance requires it (see on-site data destruction).
Remarket of current-gen gearDell PowerEdge, HPE ProLiant, Supermicro, Cisco UCS, storage arrays, networking — remarketed through our channel network. Residual value settled in USD to the parent entity.
Licensing + support cancellation evidenceSerial-level destruction cert enables you to cancel OEM support contracts and software licences tied to retired hardware. We generate the evidence the contract cancellation requires.
ESG reporting — Scope 3 Category 5Reuse and recovery data in CARB SB 253 / CSRD ESRS E1 reporting format. Carbon-equivalent reuse credit for the gear that goes to secondary market.
Cohort-planned decommissioning across every site in your migration portfolio.
Cohort-planned decommissioning across every site in your migration portfolio.

Why it belongs to a program, not a ticket.

A cloud migration is a portfolio of cutover events across 18-36 months. A single site might have three cutover waves: the first dependencies move, then the dependent workloads, then the final fallback systems. The on-prem gear retires in waves too. A one-off disposal vendor engaged after each wave is three separate RFPs, three scope negotiations, three CoC trails, three invoices. By the second site you're running a procurement project instead of finishing your migration.

A program contract replaces all of that with a single MSA and a cohort schedule. Each cohort is a pickup window pegged to a cutover date. The scope definition happens once, during migration planning, not three times per site. The CoC trail is continuous across the portfolio. The reporting rolls up: how much was destroyed, how much was remarketed, what the residual value recovery looks like against the migration budget, what the Scope 3 reuse data was.

For a mid-sized enterprise doing 5 sites over 24 months, program ITAD typically saves 200-400 hours of program management time and 15-30% of the per-drive disposition cost against piecemeal RFPs. For a Fortune 500 at 50+ sites, the numbers are an order of magnitude larger.

Migration phase × on-prem footprint × Maxicom role.

Migration phaseTypical on-prem footprintMaxicom roleTiming
Discovery & planningFull on-prem, no migration yetProgram scope, cohort plan, site surveyT – 6 to T – 12 months
Wave 1 (dependency migration)Partial retirement of edge systemsSmall-cohort pickups, data destruction, continued-use gear flaggedT + 0 to T + 3 months per site
Wave 2 (workload migration)Majority of workloads cut over, fallback gear still activeMajor cohort pickup, remarket current-gen, destroy sensitive mediaT + 3 to T + 9 months per site
Wave 3 (fallback retirement)Fallback systems retired, DC floor emptyingFinal DC floor clearance, PDU/UPS/HVAC coordination, site handbackT + 9 to T + 18 months per site
Program closeZero on-premConsolidated reporting, licence cancellation evidence, ESG datasetT + 18 to T + 24 months portfolio-wide
Timeline anchor T = per-site cutover-start date. Portfolio-wide timing varies by migration strategy (big-bang vs. phased, multi-cloud vs. single-hyperscaler).

Cloud repatriation also counts.

Some workloads are coming back on-prem. The 2024-2026 repatriation trend is real — 37signals / Basecamp, Dropbox, GEICO, Ahrefs, X all published migrations away from cloud for workloads where on-prem math wins at scale. For those enterprises, the ITAD workflow runs in reverse: new on-prem gear lands, cloud workloads cut back over, and then the cloud resources get de-provisioned. But the new on-prem rollout usually displaces older on-prem gear that was running fallback or edge workloads during the cloud era. That older gear needs the same cohort-planned ITAD treatment as a cloud-outbound migration — data destruction, residual value recovery, licence cancellation.

Maxicom's program model covers both directions. If you're running a repatriation and need the old on-prem swap-out handled alongside the new deployment, same contract, same CoC standard, same reporting. The direction of the workload flow doesn't change the ITAD mechanics.

The program flow.

Stage 1

Migration roadmap review

We review your cutover calendar, dependency map, and site-by-site rollout plan. Cohort pickup windows mapped against each cutover event. SOW drafted.

Stage 2

Cohort planning per site

Per-site asset inventory, sensitivity classification, resale-vs-destroy triage, on-site vs off-site destruction decision per cohort. Scheduled against your cutover dates.

Stage 3

Cutover-aligned pickups

Pickup executed in the window your migration manager specified. No earlier (you still need fallback), no later (on-prem costs keep accruing).

Stage 4

Destruction + remarket

Data destruction to NIST 800-88 with cert per drive. Current-gen gear remarketed, residual value settled in USD. Prior-gen value-recovered; end-of-life routed to media destruction.

Stage 5

ESG + finance report

Quarterly report to the migration PMO: cost against budget, residual value recovered, drives destroyed, Scope 3 reuse data, OEM support cancellation evidence. Rolls up to program close.

Where the value comes back.

Residual value on current-gen servers14G–17G PowerEdge, Gen10–Gen12 ProLiant, X12/X13 Supermicro, Cisco UCS M6/M7 — all trade in strong secondary markets. Recovery can offset meaningful portions of the migration's hardware write-off.
Storage arraysNetApp AFF, Pure Storage FlashArray, Dell PowerStore, HPE Alletra — current-gen storage holds value. SSD-heavy arrays recover more than HDD arrays.
NetworkingCisco Nexus 9000, Arista 7000 series, Juniper QFX — strong secondary market, especially for data-centre-grade switches.
Licence / support cancellationOEM support contracts tied to retired hardware can be cancelled cleanly once serial-level destruction certs are in hand. Annual support cancellation typically saves 15-30% of the gear's original ticket.
Space + power recoveryEarlier DC floor clearance returns leased space and reduces the power bill. For a mid-sized DC that can be $20k-$100k/month earlier than a piecemeal clearance would return.

For the cloud program director.

For the cloud program director

Close your migration without an on-prem overhang.

Your migration budget is measured at close. The on-prem overhang after cutover is what makes migrations overrun. One ITAD program against your migration roadmap closes the on-prem cost trail on schedule, recovers residual value back to your budget, and gives your CFO a cleaner number at the close.

For the CFO

Residual value flows back to CapEx, not written off.

Fully-depreciated gear can still carry meaningful residual value. A program-level approach captures it instead of writing it off. We settle in USD to the parent entity, invoice in USD, reconcile to your AP.

FAQ.

How do you align with our cutover dates?

Your migration PMO owns the cutover calendar. We align cohort pickups to specific windows per site — typically T + 30 to T + 60 days after each cutover wave, scheduled when the fallback gear is confirmed retired. If a cutover slips, the cohort pickup slips with it; our program contract handles schedule flex at the cohort level.

What about gear still in active fallback?

Fallback gear stays in place until your migration team releases it. Our program contract includes a "parked cohort" model — we scope and plan but don't execute until the fallback release is formalised. No on-prem costs accrue to Maxicom during parking; you only pay when execution happens.

Multi-cloud migrations?

Same program model regardless of the hyperscaler mix. If you're splitting workloads between AWS, Azure, and GCP, the on-prem retirement cohorts align to the workload cutover schedule, not the destination. Portfolio-wide reporting rolls up across all cohorts.

Cloud repatriation workflow?

Mirror image. New on-prem gear arrives, old fallback/edge gear cohorts retire, data destruction + residual recovery runs on the same program contract. We handle both directions under one SOW.

Which hyperscalers have you worked alongside?

Our customers run migrations into AWS, Azure, GCP, and OCI, plus private cloud deployments on VMware Cloud, Nutanix, and OpenStack. We don't have a hyperscaler partnership — we're brand-agnostic on the cloud side too. Our role is on the on-prem retirement, not the cloud deployment.

What to do next

Ready to see what your retired IT is worth?

Request a scoping call
REVIEWED: November 2026  ·  FIRST PUBLISHED: November 2026WRITTEN BY THE MAXICOM USA ITAD PROGRAM DESK
Email Scoping call