Sales:SALES@maxicom.us
Office closure / move

Office closure — clear the floor, fast.

Closing a floor or a branch, or consolidating two offices into one. We quote, collect, wipe and pay — usually within two weeks end to end.

~2 weeks end to endNDA on requestClearance letter at keys-back
Boxed-up IT equipment in a cleared office at end of lease

The three shapes this takes

Floor consolidationTwo or three floors becoming one — usually a 90-day window with facilities managing.
Branch or satellite closureMany smaller sites in parallel, each with a landlord deadline. Discretion matters most.
Full-office wind-downA whole office closing — full IT clearance, with partner introductions for furniture.

What we take

We take

Laptops, desktops, monitors, docks, video bars and displays, VoIP phones, recent printers, server-room contents, networking, UPS, racks, AV.

We don’t take

Furniture, in-wall cabling and patch panels, bolted-in security equipment, kitchen equipment. We can introduce clearance partners.

Timed to your landlord window
Timed to your landlord window

How a typical closure runs

Day 0–1

Walk-through & range

Video or on-site walk; written range by email.

Day 2–5

Inventory & firm quote

SOW, NDA if needed, pickup date confirmed.

Day 3–10

Employee laptops

HR hand-backs received and consolidated at a staging location.

Day 7–14

Floor & server-room pickup

Serial-logged loading, timed to your landlord window.

+3–7 days

Erasure & certificates

NIST 800-88 in-country; certificate per drive.

Keys-back

Clearance letter

Confirmation that all IT has been removed.

+14–21 days

Closeout & payment

Asset register, certificates, wire or ACH in USD.

Where we do office closures

US & CanadaEvery major metro and many secondary markets. Steady branch programs for banks, retailers and insurers.
UAEDubai (DIFC, Media City, Business Bay) and Abu Dhabi. NDA on request.
IndiaMumbai, Bengaluru, Hyderabad, Chennai, Pune, Delhi NCR.
Singapore & APACSingapore, KL, Manila, Bangkok, Jakarta, Sydney, Melbourne, Tokyo, Seoul, Hong Kong.
GulfSaudi Arabia, Qatar, Oman, Kuwait, Bahrain via local partners.

Hybrid-work office downsize — why this got urgent since 2023

Since 2023, corporate real-estate footprints have been shrinking. Full office closures, floor consolidations, and co-working transitions all generate an IT clear-out workstream — desktops, dock stations, monitors, phones, conference-room AV, kitchen electronics, the badge-printer nobody remembers buying.

The pattern we see most often: a company closes a satellite office with 80–200 seats, returns the space to the landlord by a hard lease-end date, and needs the IT cleared, the data-bearing drives destroyed, and the asset manifest filed with finance before the keys go back. The total workstream runs 2–6 weeks depending on scale.

Employee laptop logistics — the WFH gear retrieval problem

For companies that distributed laptops to remote workers who are now leaving the company or the office is closing, the retrieval problem is real. A 300-person office closure with 60 percent WFH distributes IT across 300 home addresses, not one building. The logistics are: HR-triggered return-packaging kits, prepaid return shipping, consolidated receiving at Maxicom's facility, wipe-and-decide (re-image for the next hire, buyback, or destroy), and the asset manifest back to your ITAM.

Return rates on WFH gear in hard termination scenarios run 70–85 percent without follow-up and 90–95 percent with an active retrieval workflow. We run the retrieval workflow on your behalf when the SOW includes it.

Lease-end timeline — working backwards from handover

Working backwards from the lease handover date: T−1 week is final walkthrough and sign-off; T−2 is destruction-evidence delivery and final pickups; T−4 is the main pickup wave; T−6 is inventory consolidation and the first destruction batch; T−8 is kickoff and MSA signing.

For an office closure IT clearance running against a hard lease date, the cardinal sin is starting the IT workstream after the facilities team has already begun. Start the IT workstream T−8 weeks; coordinate with facilities on the shared pickup calendar.

What to do next

Laptop & desktop buyback

The bulk of most office exits.

→

Data destruction

A certificate per laptop drive, in your closeout.

→

Quote this closure

Send the list and the deadline.

→

Ready to see what your IT is worth?

Request a scoping call

If the closure is also triggered by a cloud migration, our Cloud migration ITAD program covers on-prem disposition cutover-aligned with the migration schedule.

REVIEWED: November 2026  ·  FIRST PUBLISHED: November 2026WRITTEN BY THE MAXICOM USA ITAD PROGRAM DESK
Email Scoping call