What’s included
How it works
You send the list
CSV, spreadsheet, photos or a rough description. We acknowledge the same day.
Written USD offer
Model-by-model pricing against live wholesale bids. No disposal, handling or back-end fees.
Paperwork & pickup booked
NDA or MSA if you need them. Local logistics partner booked, chain-of-custody manifest prepared.
Pickup & in-country erasure
Free collection. NIST 800-88 Clear / Purge / Destroy per drive. Certificate per drive.
Paid in USD
Wire or ACH. Certificates and chain-of-custody documents delivered.

Common questions
How long does a quote take?
Small lots: the same or next business day. Larger lots or full programs: a scoping call within one business day, then an indicative range in 3–5 business days after NDA and inventory confirmation.
Is there a minimum quantity?
It depends on the category. No minimum on data-center decommissions or AI/GPU hardware. 50 units for laptop and desktop fleets, 100 modules for loose memory, 50 loose CPUs, and 10 chassis for servers and storage on a cold quote (smaller is fine on existing accounts).
What's in the closeout pack?
Asset register with every serial, model, grade and final downstream; a sanitization certificate per drive; chain-of-custody log; settlement statement; environmental documentation; optional Scope 3 Category 5 report.
Do you take title at pickup?
On flat buyouts, yes — title transfers at pickup. On revenue share, title usually transfers at sell-through and we hold the assets on consignment until then.
A data center decommissioning playbook
A data center decommissioning engagement is not a glorified pickup — it is a controlled teardown with chain-of-custody obligations, destruction evidence, and typically a rack-density challenge the pre-decom tour did not catch. Data center decommissioning services are priced per-rack, per-site, or on a fixed-project basis depending on scale.
Site scales we handle
| Site scale | Lead time | Team size | Typical duration |
|---|---|---|---|
| Single rack | 1–2 weeks | 2 technicians | 1 day |
| Half row (10–15 racks) | 2–3 weeks | 3–4 technicians | 2–3 days |
| Whole row (20–40 racks) | 3–4 weeks | 4–6 technicians + logistics | 4–7 days |
| Hall or cage (50–100 racks) | 4–6 weeks | 6–10 technicians + PM + logistics | 2–3 weeks |
| Whole building (200+ racks) | 6–10 weeks | Dedicated team + multi-shift | 3–8 weeks |
Liquid cooling and rack-density considerations
High-density racks pushing 30–80 kW with direct-to-chip liquid cooling are now common in AI training halls and increasingly in general enterprise data centers. Decom of a liquid-cooled rack is operationally different from air-cooled: the CDU (coolant distribution unit) has to be drained safely, dielectric fluid or treated water routed to approved disposal, flexible hoses disconnected under pressure checks, and the rack itself may carry residual coolant.
Our teams carry the PPE and the drain procedures for the common CDU vendors (CoolIT, Motivair, Vertiv, Supermicro) and the common fluid types (treated water, 3M Novec, Shell S3X). On a mixed-fleet decom we sequence air-cooled rows first for fast movement, liquid-cooled rows second with the slower drain protocol.
Pre-decom inventory and labelling
The thirty days before decom day are where the program either works or does not. The deliverable going in: a verified rack-by-rack inventory with asset tag, serial, hostname (where captured), decom disposition (destroy / buyback / return to lease), and data-classification flag.
On programs where your CMDB is already accurate, we import the inventory, reconcile against physical tags, and flag discrepancies for your team to resolve before decom day. On programs where the CMDB is stale, we front-load a one- to two-day walkthrough to capture the ground truth, with photo documentation per rack, before any teardown begins.
De-racking and crating
The physical teardown runs on a documented sequence: power down and witness, cable removal per rack, rail removal, chassis lift, serial capture on the manifest, foam-bed or anti-static packaging, pallet build, seal and photograph. Chain of custody signs at the loading dock before departure.
Rack frames, PDUs, cable trays, and in-rack cooling are handled separately. Most frames have no resale value and are routed to a licensed metals processor; higher-end frames (APC, Rittal with monitoring, liquid-cooled frames) do carry residual. We quote them per the SOW.
Data destruction at origin vs destination — the choice framework
For any DC decom carrying data-bearing media, the recommended default is destruction at origin — before the media leaves the facility. Reasons: chain of custody is shortest, cross-border transfer concerns are avoided for international customers, and the witness options are simplest when your team is already on site.
Destruction at destination is appropriate when: the origin site has no space for a destruction station, the media has to move to a secure consolidation facility, or the destination facility has specialist equipment (large-scale shredder, degausser array) the origin cannot match. On programs where destruction runs at destination, media travels under sealed custody with intrusion-evident tape and documented hand-offs.
The decom you don't have to babysit.
One PM, one SOW, boots on the floor when your SOW says so. Pre-decom inventory reconciled against your CMDB, liquid-cooling teardown by crews that have done it before, cross-border logistics managed end-to-end. You keep running the rest of your estate; we clear the decom site.
DC decommissioning questions
Can you de-rack while the surrounding rack stays live?
Yes, standard. Decom sequencing is designed around live production — we work by rack or by row, with power and cooling isolation at each boundary. If the site is being torn down fully we can also run a full-hall takedown in a maintenance window.
What about rack-mounted cooling units and PDUs?
Priced in the SOW. Metered PDUs and rack-level CDUs typically carry residual and are remarketed; unmanaged PDUs and legacy cooling go to metals processing.
How do you handle structured cabling and overhead cable trays?
Scope decision. Fiber and copper patch runs are commonly removed for landlord handover; structured cabling in the plenum is usually left in place unless the SOW says otherwise. We run the scope question at the pre-decom walkthrough.